Lightvector paintings of the renovations to 322 Dundas Street West

a new foundation is being added to the back:

new walls are being built on the foundation:

a cantilevered floor is extending out over the alley, using particle board timbers (3/8 inch thick particle board on edge, by way of "Silent Floor" 2 by 12 inch particle board "I" beams):